Sewa Alat Berat Pontianak SEPTEMBER 2024
Berikut ini kami lampirkan daftar sewa alat berat untuk anda yang berada di daerah Pontianak dan kota terdekat di sekitarnya.
DAFTAR HARGA SEWA ALAT BERAT PONTIANAK TERBARU SEPTEMBER 2024
No | JENIS ALAT BERAT | MERK | HARGA |
---|---|---|---|
1 | Excavator Mini PC 40 Pontianak | All merk | IDR 260.000 /jam |
2 | Excavator Mini PC 50 Pontianak | All merk | IDR 260.000 /jam |
3 | Excavator Mini PC 75 Pontianak | All merk | IDR 270.000 /jam |
4 | Excavator PC 100 Pontianak | All merk | IDR 255.000 /jam |
5 | Excavator PC 200 Pontianak | All merk | IDR 295.000 /jam |
6 | Wheel Loader 0,8M3 Pontianak | Komatsu WA-70 | IDR 220.000 /jam |
7 | Wheel Loader 1,2M3 Pontianak | Komatsu WA-100 | IDR 240.000 /jam |
8 | Wheel Loader 1,2M3 Pontianak | Komatsu WA-120 | IDR 260.000 /jam |
9 | Wheel Loader 1,5M3 Pontianak | Komatsu WA-150 | IDR 270.000 /jam |
10 | Wheel Loader 1,8M3 Pontianak | Komatsu WA-180 | IDR 300.000 /jam |
11 | Wheel Loader 2,0M3 Pontianak | Komatsu WA-200 | IDR 330.000 /jam |
12 | Wheel Loader 3,0M3 Pontianak | Komatsu WA-300 | IDR 360.000 /jam |
13 | Wheel Loader 3,2M3 Pontianak | Komatsu WA-320 | IDR 380.000 /jam |
14 | Bulldozer D20-3 Pontianak | Komatsu | IDR 250.000 /jam |
15 | Bulldozer D31E Pontianak | Komatsu | IDR 255.000 /jam |
16 | Bulldozer D65P Pontianak | Komatsu | IDR 270.000 /jam |
17 | Bulldozer D85 Pontianak | Komatsu | IDR 285.000 /jam |
18 | Motor Grader 125 HP Pontianak | CAT 120H | IDR 270.000 /Jam |
19 | Motor Grader 135 HP Pontianak | Komatsu GD511 | IDR 290.000 /Jam |
20 | Motor Grader 180 HP Pontianak | Komatsu GD655 | IDR 350.000 /Jam |
21 | Crane Kapasitas 30-35 ton Pontianak | IDR 450.000 /Jam | |
22 | Crawler Crane 10-15 ton Pontianak | IDR 4.000.000 /Shift | |
23 | Roughter Crane 10 ton Pontianak | IDR 5.600.000 /Shift |
Keterangan :
- Harga Sewa alat berat di atas dapat berubah-ubah.
- Harga sewa alat berat di atas belum termasuk bahan bakar dan operator.
- Harga sewa alat berat diatas belum termasuk Biaya Mobilisasi dan Demobilisasi.
- Pembayaran sewa alat berat Dilunasi Sebelum Unit Alat Berat Dikirim.